BAE Systems' San Diego Shipyard to Tandem Dry-Dock Two Destroyers
September 18, 2019 | BAE SystemsEstimated reading time: 2 minutes
BAE Systems has received $170.7 million in contracts from the U.S. Navy to perform simultaneous maintenance and repair on two Arleigh Burke-class (DDG 51) guided-missile destroyers in its San Diego shipyard.
Under the awarded contracts, the shipyard will tandem dry-dock the USS Stethem (DDG 63) and USS Decatur (DDG 73) in October. The synchronized two-ship docking will be a first for the company’s newest dry-dock in San Diego. The contracts include options that, if exercised, would bring the cumulative value to $185 million.
“The ability to simultaneously dock two DDGs is a special capability that BAE Systems brings to our Navy customer and comes at a critical time when additional throughput is necessary to meet surface combatant demands and modernization requirements,” said David M. Thomas Jr., vice president and general manager of BAE Systems San Diego Ship Repair. “Beyond the remarkable nature of this tandem docking, it will be business as usual for our shipyard team and partners given our significant experience working with the Arleigh Burke class.”
Positioned end to end, the USS Stethem and USS Decatur will be lifted together inside BAE Systems’ “Pride of California” dry-dock. Installed in 2017, the Pride of California is 950 feet long, 160 feet wide and has a lifting capacity of 55,000 tons – making it the largest floating dry-dock in San Diego. The destroyers each displace about 9,000 tons and are expected to be re-floated in April 2020.
The USS Stethem is the 13th ship of the Arleigh Burke class, which is the Navy’s largest class of surface warfare combatants. Named for Master Chief Constructionman Robert Stethem, the 505-foot-long ship was commissioned in October 1995. BAE Systems will perform hull, mechanical and engineering repairs aboard the ship. Once back in the water, the Stethem’s Extended Docking Selected Restricted Availability (EDSRA) is expected to be completed in October 2020.
The USS Decatur is the 23rd ship of the Arleigh Burke class. Named for the early 19th Century Naval hero Stephen Decatur Jr., the ship was commissioned in August 1998. BAE Systems will perform much of the same upgrade work aboard the 505-foot-long Decatur as it will perform on-board the Stethem. After undocking, the Decatur’s EDSRA work is expected to continue into October 2020.
BAE Systems’ San Diego shipyard currently employs about 1,300 people and hundreds of temporary workers and subcontractors nearby the San Diego-Coronado Bridge.
About BAE Systems
BAE Systems is a leading provider of ship repair, maintenance, modernization, conversion, and overhaul services for the Navy, other government agencies, and select commercial customers. The company operates four full-service shipyards in California, Florida, Hawaii, and Virginia, and offers a highly skilled, experienced workforce, six dry docks, two railways, and significant pier space and ship support services.
Suggested Items
Real Time with... IPC APEX EXPO 2024: AI Implementation at Omron
04/18/2024 | Real Time with...IPC APEX EXPOEditor Nolan Johnson and Omron Product Manager Nick Fieldhouse discuss the company's focus on AI implementation to enhance customer experience and results. They address programming challenges and how AI can help customers achieve better outcomes with less experience. Omron's AI is compatible with existing systems, facilitating easy upgrades.
Cadence Unveils Palladium Z3 and Protium X3 Systems
04/18/2024 | Cadence Design SystemsThe Palladium Z3 and Protium X3 systems offer increased capacity, and scale from job sizes of 16 million gates up to 48 billion gates, so the largest SoCs can be tested as a whole rather than just partial models, ensuring proper functionality and performance.
Australian Flow Batteries and The SCHMID Group Announce Groundbreaking Memorandum of Understanding
04/17/2024 | SCHMID GroupAustralian Flow Batteries Pty Ltd (AFB), a leader in innovative energy solutions and economical, safe, and reliable power storage, and SCHMID Energy Systems GmbH a company of the German SCHMID Group, a global technology leader with a rich history in delivering innovative solutions across multiple industries including Electronics, Renewables, and Energy Storage sectors, are thrilled to announce the signing of a Memorandum of Understanding (MoU)
Ansys Joins BAE Systems’ Mission Advantage Program to Advance Digital Engineering Across US Department of Defense
04/16/2024 | ANSYSAnsys announced it is working with BAE Systems, Inc., to accelerate the adoption of digital engineering and MBSE across the Department of Defense (DoD).
Designing Electronics for High Thermal Loads
04/16/2024 | Akber Roy, Rush PCB Inc.Developing proactive thermal management strategies is important in the early stages of the PCB design cycle to minimize costly redesign iterations. Here, I delve into key aspects of electronic design that hold particular relevance for managing heat in electronic systems. Each of these considerations plays a pivotal role in enhancing the reliability and performance of the overall system.