U.S. Navy Wins $26M Maintenance Contract for USS Iwo Jima
July 14, 2015 | BAE SystemsEstimated reading time: 1 minute
The U.S. Navy has awarded BAE Systems a $26.8 million contract for the phased maintenance of the USS Iwo Jima (LHD 7), a Wasp-class amphibious assault ship.
The scope of work under the firm fixed price contract includes structural and tank repairs and preservation, repairs to ventilation and auxiliary systems, temporary services, habitability upgrades, ship alterations, and other repairs. The contract contains options which, if exercised, could bring its total value to $32.6 million.
“We look forward to welcoming Iwo Jima back to Naval Station Mayport later this summer,” said David Thomas, director of ship repair, Jacksonville and Mayport, at BAE Systems. “Our men and women are eager to leverage their expertise and get to work on the ship in support of the Navy and Marine Corps.”
The phased maintenance availability is scheduled to begin on Aug. 31, 2015 and conclude by July 1, 2016.
About BAE Systems
BAE Systems is a leading provider of ship repair, maintenance, modernization, conversion, and overhaul for the Navy, other government agencies and commercial and private customers. The company operates seven full-service shipyards in Alabama, Florida, California, Virginia, and Hawaii, and offers a highly skilled and experienced workforce of more than 5,000 employees, eight dry docks, and significant pier space and ship support services. The company also has commercial shipbuilding and module fabrication capabilities at its Mobile, Alabama, and Jacksonville, Florida, shipyards.
Suggested Items
Lockheed Martin Successfully Transitions Long Range Discrimination Radar To The Missile Defense Agency
04/23/2024 | Lockheed MartinThe Long Range Discrimination Radar (LRDR) at Clear Space Force Station in Clear, Alaska, completed DD250 final acceptance and was officially handed over to the Missile Defense Agency in preparation for an Operational Capability Baseline (OCB) decision and final transition to the Warfighter. In addition, prior to this transition, the system has started Space Domain Awareness data collects for the United States Space Force.
Real Time with... IPC APEX EXPO 2024: AI Implementation at Omron
04/18/2024 | Real Time with...IPC APEX EXPOEditor Nolan Johnson and Omron Product Manager Nick Fieldhouse discuss the company's focus on AI implementation to enhance customer experience and results. They address programming challenges and how AI can help customers achieve better outcomes with less experience. Omron's AI is compatible with existing systems, facilitating easy upgrades.
Cadence Unveils Palladium Z3 and Protium X3 Systems
04/18/2024 | Cadence Design SystemsThe Palladium Z3 and Protium X3 systems offer increased capacity, and scale from job sizes of 16 million gates up to 48 billion gates, so the largest SoCs can be tested as a whole rather than just partial models, ensuring proper functionality and performance.
Australian Flow Batteries and The SCHMID Group Announce Groundbreaking Memorandum of Understanding
04/17/2024 | SCHMID GroupAustralian Flow Batteries Pty Ltd (AFB), a leader in innovative energy solutions and economical, safe, and reliable power storage, and SCHMID Energy Systems GmbH a company of the German SCHMID Group, a global technology leader with a rich history in delivering innovative solutions across multiple industries including Electronics, Renewables, and Energy Storage sectors, are thrilled to announce the signing of a Memorandum of Understanding (MoU)
Ansys Joins BAE Systems’ Mission Advantage Program to Advance Digital Engineering Across US Department of Defense
04/16/2024 | ANSYSAnsys announced it is working with BAE Systems, Inc., to accelerate the adoption of digital engineering and MBSE across the Department of Defense (DoD).