Next Generation Jammer Mid-Band Takes Flight for First Power Generation Test
November 5, 2019 | Raytheon CompanyEstimated reading time: Less than a minute
Raytheon Company (NYSE: RTN) completed the first power generation flight test of the Next Generation Jammer Mid-Band. The U.S. Navy will use the test data to inform the airworthiness authorization decision to fly NGJ-MB on the EA-18G Growler in the spring of 2020.
Raytheon conducted the three flight tests onboard a Calspan commercial jet to assess the jammer's prime power generation system, known as the ram air turbine generator, at Niagara Falls Airport in New York. The generator scoops air from the airstream, turns a turbine and creates electricity that enables NGJ-MB to jam enemy radars and communications.
"This is the first time the pod generated its own power outside of a lab," said Ernest Winston, senior manager for Electronic Warfare Systems. "Future tests will verify the power is sufficient to enable NGJ-MB to significantly enhance range, attack multiple targets simultaneously and perform advanced jamming."
Raytheon's NGJ-MB ram air turbine generator is designed to give the Growler more power than it has ever had before to jam at unprecedented levels. Its open architecture and design allow the technology to be scaled to other missions and platforms.
Suggested Items
Manta Ray UUV Prototype Completes In-Water Testing
05/02/2024 | DARPAThe Manta Ray prototype uncrewed underwater vehicle (UUV) built by performer Northrop Grumman completed full-scale, in-water testing off the coast of Southern California in February and March 2024.
Real Time with… IPC APEX EXPO 2024: Exploring Electronic Card Testing and AI Integration with SPEA
05/02/2024 | Real Time with...IPC APEX EXPOLuca Fanelli, president of SPEA, and vice president Andrea Furnari discuss the company and its business units. The challenges in testing electronic cards and SPEA's solutions are discussed, and its focus on the US market is emphasized. The use of AI in testing, particularly in optical inspection and test program execution, is also examined.
Boeing T-7A Red Hawk Triples Progress
05/01/2024 | BoeingThe Boeing T-7A Red Hawk achieved three recent milestones, propelling the advanced pilot trainer for the U.S. Air Force forward.
Keysight Secures New Test Case Validations for Narrowband Non-Terrestrial Networks Standard
04/30/2024 | Keysight TechnologiesKeysight Technologies, Inc. has validated new conformance test cases for 3rd Generation Partnership Project (3GPP) Release 17 (Rel-17) standards for non-terrestrial networks (NTN) using narrowband internet of things (NB-IoT) technology.
Latest Test and Inspection Solutions from GOEPEL electronic at SMTconnect 2024
04/29/2024 | GOEPEL electronicGOEPEL electronic will be demonstrating automated test and inspection equipment at SMTconnect, taking place in Nuremberg from June 11 to 13, 2024.